@robotfleet-hq/security-orchestra

security MCP Server

56 AI-powered data center intelligence agents via MCP. Generator sizing, PUE calculations, network topology, cooling load analysis and more. SSE transport.

VerifiedInstall Ready
securitysecurity
3 views0 stars0 forksv1.0.0NOASSERTION

Why This Matters

Discovered via smithery and last synced 2mo ago.

VerifiedInstall Ready
Source
smithery
Stars
0
Last synced
2mo ago
Install
Instructions detected

Install

1. Install the package

npm install @robotfleet-hq/security-orchestra
74
Tools
0
Resources
0
Prompts
Standard I/O
Transport

Available Tools (74)

chain_full_site_analysis

Site Scoring > Tier Cert > Utility > Permits > Cost > Timeline

chain_tco_deep_dive

PUE > Cooling Load > TCO Analyzer

chain_cooling_optimization

Cooling > Chiller > CRAC vs CRAH > Airflow > Economizer

ups_sizing

Size UPS systems per IEEE 485/1184 — VRLA or Li-ion, N/N+1/2N configs

Chain

Pipeline

pue_calculator

Calculate PUE with optimization recommendations

chain_site_readiness

Site Scoring > Tier Cert > Utility Interconnect > Compliance

chain_sustainability_package

Carbon > Solar > Battery > Energy Procurement > Environmental

Category

Agents

chain_emergency_power_package

UPS > ATS > Generator > Fuel Storage > NFPA 110

power_density

Analyze rack power density and PDU sizing per NEC 645

airflow_modeling

Model hot/cold aisle containment and CFM requirements

chain_nc_power_package

NC Utility Interconnect > Generator > NFPA 110 > UPS

generator_sizing

Size generators for data center loads with NEC/NFPA compliance

chain_full_power_analysis

Generator > NFPA 110 > UPS > ROI

Protocol

Status

deterministic_calc

All 50+ individual agents

bandwidth_sizing

Size north-south and east-west bandwidth

construction_cost

Estimate $/MW construction costs with regional factors

utility_interconnect

Analyze utility interconnect for 9 major US utilities

compliance_checker

Check SOC 2, ISO 27001, NIST CSF, PCI DSS, FedRAMP

tco_analyzer

Analyze total cost of ownership over facility life

Free

$0

permit_timeline

Model permitting timelines across jurisdictions

energy_procurement

Evaluate PPA, direct access, and retail energy strategies

physical_security

Design layered physical security per Uptime tier standards

capacity_planning

Forecast capacity runway and expansion triggers

tier_certification

Assess tier certification readiness with gap analysis

roi_calculator

Calculate NPV, IRR, payback using DCF analysis

Enterprise

$499

Live

Per-agent ACP endpoints + OASF manifests

Context

Description

multi_agent_chain

All 8 compound chains

cached

Cached result

ats_sizing

Size automatic transfer switches per NEC 700/701/702

fuel_storage

Design diesel fuel storage per NFPA 30 — tanks, containment, SPCC

nfpa_110_checker

Validate emergency generator compliance per NFPA 110

harmonic_analysis

Analyze THD in power distribution per IEEE 519

voltage_drop

Calculate voltage drop per NEC 210.19

battery_storage

Design BESS for backup, peak shaving, demand response

demand_response

Model utility demand response program participation

Agent

What it does

incentive_finder

Find federal/state incentives, IRA credits, utility rebates

redundancy_validator

Validate against Uptime Institute Tier I-IV standards

fire_suppression

Design clean agent fire suppression per NFPA 2001/75

cooling_load

Calculate cooling load per ASHRAE TC 9.9

network_topology

Design spine-leaf network topology

site_scoring

Score candidate sites across power, connectivity, risk, cost

Tier

Monthly

chiller_sizing

Size water-cooled and air-cooled chillers

dns_architecture

Design DNS — authoritative, recursive, anycast, DNSSEC

construction_timeline

Phase-by-phase schedule with regulatory modifiers

nc_utility_interconnect

North Carolina-specific utility interconnect analysis

sla_calculator

Model SLA availability against tier benchmarks

Starter

$29

crac_vs_crah

Compare CRAC vs CRAH — cost, efficiency, constraints

ip_addressing

Plan IP addressing and VLAN architecture

Pro

$99

economizer_analysis

Analyze free-cooling potential by climate zone

fiber_connectivity

Analyze fiber routes and carrier diversity

water_availability

Assess water supply, stress risk, and recycled water options

carbon_footprint

Calculate Scope 1/2/3 emissions per GHG Protocol

surveillance_coverage

Calculate CCTV coverage, storage, and retention

change_management

Design change management process per tier class

humidification

Design humidification systems per ASHRAE A1 envelope

latency_calculator

Calculate propagation latency by medium and hop count

noise_compliance

Analyze generator noise vs local ordinances

cybersecurity_controls

Map controls to NIST CSF and CIS benchmarks

commissioning_plan

Generate commissioning plans per ASHRAE Guideline 1.2

bgp_peering

Design BGP peering and route reflector architecture

environmental_impact

Assess NOx/PM2.5/CO2 emissions per EPA AP-42

solar_feasibility

Analyze on-site solar PV — capacity, IRA credits, payback

biometric_design

Design biometric access control — FAR/FRR, throughput

maintenance_schedule

Build annual PM schedules per NFPA and OEM specs